Parramatta CBD — Charles Street Opening
Simulation model developed in Dynameq to study a proposed city centre bypass through Parramatta CBD.
- Region
- Parramatta, NSW
- Software
- Dynameq
Dynamic assignment that resolves queues, junctions, and time-of-day effects.
Mesoscopic models sit between strategic and microsimulation: individual vehicles on a detailed network, without the calibration burden of full microsimulation. They resolve queuing, junction delay, and the way congestion spreads and clears across a peak.
We extract a subarea from a strategic model, add detailed network and intersection coding, develop origin-destination matrices from turn counts, and calibrate against screenline volumes and observed travel times.
A calibrated Dynameq model, scenario comparisons, and — where the client will operate the model themselves — training so their team can run and interrogate it.
Simulation model developed in Dynameq to study a proposed city centre bypass through Parramatta CBD.
Dynameq testing of a six-second bus queue jump scheme at Macquarie Centre, finding a large reduction in bus travel time variability.
Independent Dynameq verification of a developer's Paramics model for the Charlestown Shopping Town expansion, later adopted for the Charlestown Master Plan.
Dynameq modelling of a greenfield land release at Lochinvar, testing staging options and connections to and across the New England Highway.
Modelling to support Maitland City Council's CBD revitalisation plan, testing a Southern Bypass and City Mall opening options.
Explored internal road network options for the growing township of Medowie, balancing capacity for growth from 7,000 to 15,000 residents against the character of the town.
Dynameq analysis of a Sturt Highway median treatment through Wagga Wagga, assessing how fewer lane changes could reduce the accident rate near the Base Hospital.
Modelled internal and external traffic options for the 535 hectare Tallawarra Lands development near Wollongong, identifying a future capacity shortfall.
Work delivered by Nix Pokasamrith over his career, including engagements held by other organisations. Each entry states the delivery context. These are not commissions held by Transport Modelling.
Led the development of a mesoscopic traffic model of the Hervey Bay road network.
Led the update of a mesoscopic Dynameq model of the Rockhampton road network, working with AECOM.
Tell us what you are trying to decide, and we will tell you whether a model is the right way to decide it.